Description

ZQ127/25 Drill Pipe Power Ключ

2-3/8″ to 5-1/2″ | 25 kN.m Max Torque | Two-Speed | Гидравлический Operation


Product Overview

The ZQ127/25 Drill Pipe Power Ключ is a mouth-opening type hydraulic power tong designed for makeup and breakout of 2-3/8″ to 3-1/2″ drill pipe, 2-3/8″ to 4-1/2″ tubing, and 4-1/2″ to 5-1/2″ casing in oilfield workover and well servicing operations. Featuring a two-speed planetary gear system, safety door linkage protection, and interchangeable die seats and dies, the ZQ127/25 delivers reliable, high-torque performance with outstanding operational safety.

Operating Range: 2-3/8″ to 5-1/2″ | Max Torque: 25 kN.m (Low Шестерня) | Max Speed: 43 rpm (High Шестерня) | Weight: 680 kg


В сборе Drawing

ZQ127/25 Drill Pipe Power Ключ general assembly drawing showing master tong, backup tong, guide poles and hydraulic bucket

ZQ127/25 Drill Pipe Power Ключ General В сборе Drawing


Key Features

  • Mouth-Opening Design: Open-throat configuration allows quick positioning around the pipe string without stripping over the tool joint
  • Two-Speed Planetary Шестерня System: High gear (43 rpm) for speed, low gear (8 rpm) for maximum torque of 25 kN.m
  • Safety Door Linkage Protection: Flexible shaft controlled reversing valve stops the tong immediately when the safety door opens, preventing accidental operation
  • Interchangeable Die System: 8 die seat sizes and 3 die ranges cover the full operating range with quick-change capability
  • Combination Ключ Configuration: Master tong + backup tong with front and back guide pole assemblies for stable pipe engagement
  • Гидравлический Lift Bucket: Integrated hydraulic lifting cylinder with throttle and stop valve for precise height positioning
  • Dual Handle Operation: Fore handles (RH/LH) and back handles for safe two-handed operation and positioning
  • Centralizing Roller System: 21 centralizing rollers with shafts ensure proper alignment around the pipe
  • Multiple Die Седло Options: Die seats available from 2-3/8″ to 6-1/8″ marked sizes for different pipe and coupling requirements
  • Durable Construction: Heavy-duty steel construction with ductile iron components and hardened gear surfaces

Technical Specifications

Parameter Specification
Model ZQ127/25
Application Range 2-3/8″ to 3-1/2″ Drill Pipe / 2-3/8″ to 4-1/2″ Tubing / 4-1/2″ to 5-1/2″ Casing
Rated Oil Supply Pressure 16 MPa (2,320 PSI)
Rated Oil Supply Flow 120 L/min (31.7 GPM)
Max Torque (Low Шестерня) 25 kN.m (18,440 ft-lbs)
Max Torque (High Шестерня) 5.1 kN.m (3,760 ft-lbs)
Max Speed (High Шестерня) 43 RPM
Max Speed (Low Шестерня) 8 RPM
Гидравлический Motor J6K-625
Overall Dimensions 1,270 x 770 x 780 mm
Net Weight 680 kg (1,499 lbs)
Гидравлический Oil Type YC-N46 / YB-N46 / YA-N46 (per ambient temperature)
Max Oil Temperature 65 C (149 F)

Die Седло & Die Selection Guide

Die Седло Mark Application Die Size Range
Die Седло (1) 3-1/2″ 2-3/8″ DP, 3-1/2″ TBG 73-78
Die Седло (2) 4″ 2-7/8″ DP, 4″ TBG 89-114
Die Седло (3) 4-1/2″ 4-1/2″ TBG, 3-1/2″ TBG coupling, 4-1/2″ CSG 121-156
Die Седло (4) 5″ 3-1/2″ DP, 4″ TBG coupling, 5″ CSG, 4-1/2″ CSG coupling 89-156
Die Седло (5) 5-1/2″ 4-1/2″ TBG coupling, 5-1/2″ CSG, 5″ CSG coupling 121-156
Die Седло (6) 6-1/8″ 5-1/2″ CSG coupling Select
Die Седло (7) 2-7/8″ 2-7/8″ TBG Select
Die Седло (8) 2-3/8″ 2-3/8″ TBG Select

Main Components

В сборе Description
Master Ключ Main power tong with hydraulic motor J6K-625, planetary gear system, shift mechanism, and hand control valve
Backup Ключ Counter-rotation tong for holding pipe while master tong makes up or breaks out
Ключ Head В сборе Jaw set bracket, ramp, main body, open gear, retainer pin with interchangeable dies and die seats
Brake Mechanism Friction disc, brake steel plate, knob shaft with brake bolts and springs for controlled rotation
Guide Pole Assemblies Передний (x2) and back guide pole assemblies with back guy connection rated to 50 kN
Гидравлический Bucket YDT800 hydraulic lift cylinder with throttle and stop valves for height adjustment
Power Input Shaft Input shaft with deep groove ball bearings, clutch gear, inner spline gear, and shifting gear

Operation Highlights

  • Lifting: Close throttle valve, open stop valve to lift the tong. Open throttle valve and stop valve to lower
  • Height Lock: Close stop valve at desired height. Open throttle valve for normal make-up/break-out operation
  • Breakout: Move the pin axle to the lowest hole on the guide pole for breakout operations
  • Safety Door: Must be closed for operation. Opening the door immediately stops all tong movement via flexible shaft reversing valve
  • Leveling: Adjust adjusting screws on lifting bar to keep tong level for proper clamping
  • Back Guy: Must be tied to rig structure, vertical to the drill pipe during make-up. Rated load: 50 kN

Troubleshooting Guide

Problem Cause Solution
Dies Плашка Die groove filled with debris or over-worn dies Clean die grooves or replace dies
Uneven Clamping Ключ body not level; master and backup tong heads misaligned Adjust leveling screws and realign tong heads
Retaining Pin Fails Pin not seated in reset knob axle Turn reset knob and reset retaining pin
Master Clamps / Backup Slips Backup tong jaw plate turning direction opposite to master Swap hydraulic hose connections

Why Choose CAMTOP?

  • High-quality drill pipe power tongs manufactured to demanding oilfield specifications
  • Complete range of die seats and dies available for all pipe sizes in the operating range
  • Full spare parts support including hydraulic motors, gear assemblies, seal kits, and bearings
  • ISO 9001 certified quality management system
  • Competitive factory-direct pricing with global shipping
  • Technical guidance and maintenance support provided

Contact CAMTOP

Email: sales@cposl.com
Phone: 86-18621723891
Website: www.camtop-oilfieldtools.com
Address: No. 432, Fute North Road, Pudong District, Shanghai, China